Communicate with Supplier? Supplier
Krisyang Ms. Krisyang
What can I do for you?
Contact Supplier
Home > Products > Biomass Power Plant > Biomass Power Project > High Efficiency 1MW Biomass Power Project
High Efficiency 1MW Biomass Power Project
High Efficiency 1MW Biomass Power Project
High Efficiency 1MW Biomass Power Project
High Efficiency 1MW Biomass Power Project
  • High Efficiency 1MW Biomass Power Project
  • High Efficiency 1MW Biomass Power Project
  • High Efficiency 1MW Biomass Power Project
  • High Efficiency 1MW Biomass Power Project

High Efficiency 1MW Biomass Power Project

    Payment Type: L/C,T/T,Money Gram,Western Union
    Incoterm: FOB,CFR,CIF,EXW,FCA,CPT,CIP
    Min. Order: 1 Set/Sets
    Delivery Time: 25 Days
Contact Now

Basic Info

Model No.: DY-L4000

Phase: Three Phase

Frequency: 50/60Hz

Type Of Gasifier: Fluidized Bed

Fuel Material: Coconut Shell,rice Hull,,straw,branch,prong

Warranty: 1 Year

Color: As Customer's Request

After-sales Service: Field Installation, Commissioning And Training,Online Support,Video Technical Support

Power Output: 1000kw /1MW

Additional Info

Packaging: 20GP /40GP /40HQ

Productivity: 4000m³ biomass gas

Brand: Dianyan

Transportation: Ocean,Land

Place of Origin: China

Supply Ability: 200 sets/year

Certificate: ISO /SGS /CE certificates

Port: Qingdao,Tianjin,Shanghai

Product Description

1MW Biomass Power Project developed by our company adopts fluidized bed gasifier and gas purification system, which can convert rice husk, wood, coconut husk, straw and other biomass into clean gas through pyrolysis and oxidation of gasifier. The Biomass Power Plant system runs reliably and operates simply. After ignition for more than 20 minutes, the gas generator can be driven to generate electricity. This Biomass Gasifier equipment system can also be called Wood Gas Generator, Rice Husk Power , coconut husk gasification power generation and so on, depending on the different biomass raw materials.


Biomass Gasifier Project

High Efficiency 1MW Biomass Power Project

The basic principle of Biomass Gasification is to convert Agriculture and forestry products and wood processing remains (including rick husks, wood powder, branches, offcuts, corn straws, rice straws, wheat straws, cotton straws, fruit shells, coconut shells, palm shells, bagasse, corncobs and etc.) into combustible gas . It is then used as fuel in thermal and electric power application. Biomass gasification successfully conquers the disadvantages of biomass, such as low flammability and wide diversity. Biomass Gasification System is characteristic of small land requirement and environment friendly. It`s one of the most effective way of biomass utilization.

Parameters:

Type

DY-L4000

Rated output power of matched generator

1000kw /1MW

Biomass-gas

Theoretical output (m³/h)

4000m³

Contents

CO:20-25%,H2:8-15%, CH4: 2-4% , CO2: 2-4% ,N2 :40-45% , O2:≤1.0%

Fuel Material

Material ton/h

1.5~1.8

Size

Wood chips:30-50mm ;

plant stalks or straw≤100mm

Moisture

Better moisture ≤ 15%

(Max moisture ≤20%)

Heat Value of Syngas

1100-1300Kcal/m³

Produce Procedure:

Biomass gasifier procedure

Advantages:

1) Technical advantages: Circulating fluidized bed,advanced technology, large and stable gas production, can start power generator unit in 20 minutes.
2) The equipment is small in size, less footprint area require, flexible layout, and easy to operate and maintain.
3) The whole system and auxiliary equipment are all designed with high-grade explosion-proof design technology, which is more safe and reliable.
4) Energy-saving advantages: 60%-80% energy saving than natural gas and liquefied gas, high thermal efficiency.
5) Environmental advantages: Dust-free emission during operation, safe and environmentally friendly.
6) Return on investment: low energy consumption and significant economic benefits.
7) Wide range of usage: wide range of raw materials resources.

Our Service

Pre-sale services:

(1) device model choice.
(2) According to customer's special requirements, design and manufacture of products.
(3) Training technical personnel for clients.
(4) The company is free of charge to the user on-site engineering and technical personnel planning site for the user to design the best processes and program.
After-sale services :

(1) free to assign a dedicated service personnel, arriving at the scene and guiding customers' installation.
(2) equipment installation.
(3) on-site training of operators.
(4) complete sets of equipment installed, 1-2 full-time technical staff to stay free of charge to help customers on-site production of 1 month, until the user' satisfaction.

Looking for ideal 1MW Biomass Power Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the 1MW Biomass Pwer Project are quality guaranteed. We are China Origin Factory of 1MW Biomass Gasifier Power Project. If you have any question, please feel free to contact us.

Product Categories : Biomass Power Plant > Biomass Power Project

Email to this supplier
  • Ms. Krisyang
  • Your message must be between 20-8000 characters

Home

Phone

Skype

Inquiry