Communicate with Supplier? Supplier
Krisyang Ms. Krisyang
What can I do for you?
Contact Supplier
Home > Products > MSW Gasification Power Plant > Municipal Solid Waste Power Plant > Municipal Solid Waste Power Equipment Hot Sale
Municipal Solid Waste Power Equipment Hot Sale
  • Municipal Solid Waste Power Equipment Hot Sale

Municipal Solid Waste Power Equipment Hot Sale

    Payment Type: L/C,T/T,Money Gram,Western Union
    Incoterm: FOB,CFR,CIF,EXW,FCA,CPT,CIP
    Min. Order: 1 Set/Sets
    Delivery Time: 30 Days
Contact Now

Basic Info

Condition: New

Certification: SGS, ISO, CE, Other

Automation: Automatic

Screw: Other

Treatment: Pyrolysis

Gasifier Type: Downdraft Fixed Bed

Type Of Gas Cleaning: Gas Purification System

Color: As Customer's Request

After-sales Service: Field Installation, Commissioning And Training,Online Support,Video Technical Support

Additional Info

Packaging: Put in the container, control panel put in the wooden box

Brand: Dianyan

Transportation: Ocean,Land

Place of Origin: China

Supply Ability: 200

Certificate: ISO /SGS /CE certificates

Port: Qingdao,Shanghai,Tianjin

Product Description

We produce all kinds of garbage in our daily life and work. Because of the complexity of garbage components, it is difficult to treat or even use them. Generally, the most common treatment method is Msw Incineration. After incineration, garbage will produce a lot of harmful gases, and the incineration efficiency is low. On the basis of continuous reasearch and innovation, our company further disposes and utilizes garbage. We can not only use garbage to make waste plant, but also make garbage into derived garbage fuel, which can also be called Rdf Power Equipment.

Municipal Solid Waste Power Plant

Municipal Solid Waste Power Equipment Hot Sale

Garbage power generation collects all kinds of garbage and classifies them. Among them: First, high-temperature incineration (which also completely eliminated pathogenic organisms and corrosive organic substances) with high combustion value, the heat energy generated in high-temperature incineration (the smoke generated after treatment) is converted into high-temperature steam, which drives the turbine to rotate and generates electricity. The second is the fermentation and anaerobic treatment of non-combustible organic matter, and finally drying desulfurization to produce a gas called methane, also known as biogas. After combustion, heat energy is converted into vapor. Push the turbine to turn and drive the generator to generate electricity.

Fuel Materials:

msw waste gasification power plant

Main Features:

a. The gasifier furnace adopt thick heat resisting boiler steel.

b. Water jacket around the gasifier furnace to cooling the furnace and lengthen the service life of the gasifier furnace.

c. Automatic ash discharge, save manpower.

d. Running in a high automatization and intellectualization,less pollution.

e. Big yngas capacity, stable running and less maintenance cost.

f. High efficiency syngas purification system, eradicate air pollution.

g. Stable syngas supply keep the stably generating.

h. Easy operation with few manpower and low maintenance cost.

i. Adopt dry type syngas purification,have no waste water.

Advantages:

  • Innocuous. When garbage is incinerated, the temperature in the furnace is generally 900 C, and the highest temperature in the furnace core is 1100 C. After incineration, pathogenic bacteria in garbage are completely destroyed, so as to achieve the goal of harmlessness.
  • Decrement. After waste incineration, the ash only accounts for 5% of the original volume, so it can be reduced more than other waste landfill treatment methods.
  • Energy-saving benefits. Garbage power generation can supplement the shortage of electric energy and has obvious energy-
  • saving benefits.

Company Profile:

msw gasification

waste gasification

msw gasification power plant

Looking for ideal Municipal Solid Waste Power Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the Municipal Solid Waste Equipment are quality guaranteed. We are China Origin Factory of Municipal Solid Waste Power Equipment. If you have any question, please feel free to contact us.

Product Categories : MSW Gasification Power Plant > Municipal Solid Waste Power Plant

Email to this supplier
  • Ms. Krisyang
  • Your message must be between 20-8000 characters

Home

Phone

Skype

Inquiry