Contact Supplier

Ms. Krisyang
Leave a messagePayment Type: | L/C,T/T,Money Gram,Western Union |
---|---|
Incoterm: | FOB,CFR,CIF,EXW,FCA,CPT,CIP |
Min. Order: | 1 Set/Sets |
Delivery Time: | 25 Days |
Basic Info
Model No.: QM-3.0
Item: Coal Gasification Plant
HS Code: 8405100000
Product Name: Coal Gasification
Application: Heating For Industrial Kilns
Model: Single Stage Coal Gasifier
Color: As Customer's Requirements
After-sale Service: Field Installation, Commissioning And Training,Online Support,Video Technical Support
Brand: Dianyan
Additional Info
Packaging: 20GP ,40GP,40HQ,Wood cases
Productivity: 3000
Brand: Dianyan
Transportation: Ocean,Land,Air,As negiotation
Place of Origin: Henan
Supply Ability: 5 pieces within one week
Certificate: SGS
HS Code: 8405100000
Port: Qingdao,Shanghai,Guangzhou
Product Description
The Syngas Generator is mainly composed of solid coal particles reacted in the Coal Gasification Plant to produce syngas with CO and H2 as the main components. The equipment for this gas reaction is the Coal Gasifier. Coal Gasification can be divided into single-stage coal gasifier and double-stage coal gasifier according to different process and model. According to the tail gas treatment process, the two-stage coal gasifier can be divided into two-stage hot De-Tar gas station and two-stage cold gas station. Coal gasifier is widely used in steel rolling furnace, annealing furnace, forging furnace, steel tube furnace, glass furnace, aluminium melting furnace, copper furnace, pottery building furnace and other thermal furnaces.
Environmental Protection Coal Gas Power Plant
The working principle of gas gasifier is a device that produces gas from coal for use in gas equipment.Gas producer uses air and steam as gasifier agent to produce mixed gas. Suitable for gasification of weak viscous lean coal, anthracite, bituminous coal, coke and other fuels.
♦ Product Flow Chart
♦ Product Application
♦ Product Parameter
Type QM-3.0 Furnace inner diameter(mm) 3000 Furnace sectional area(m2) 7.06 Water jacket heating area(m2) 28.26 Coal consumption(Kg) 1400 Air consumption(m3/kg) 2.2-2.8 Gas production(kg/kg) 5100 Net heating value(Kj/m3) 5020-6060
♦ Company profile
1. How many days do you need to produce this machine?
This is specially designed machine according to your specific requirement. From engineer designing to production completion, It needs about 20-30 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production. Every machine will be fully assembled and carefully tested before shipment.
3. What's your machine quality guarantee?
Quality guarantee time is one year, we choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long will it take?
Yes, we supply overseas service, but customer needs to pay for the engineers flight tickets and hotel foods.Small machine usually takes within 5 days.Big machine usually takes about 20 days.
Looking for ideal Coal Power Plant Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the Coal Power Plant for Sale are quality guaranteed. We are China Origin Factory of Price of Coal Plant. If you have any question, please feel free to contact us.Product Categories : Coal Gasification Plant > Syngas Generator